NO. | PROJECT NAME | CLIENT | DESCRIPTION |
TIMING |
---|---|---|---|---|
I. COMPELTED PROJECTS |
||||
1 |
Oil Rig Trident 16, Trident 17, Galveston Key, Key Hawaii |
Transocean & Shelf Drilling |
To supply technical manpower to carry out the maintenance for rotating equipment and HVAC system |
From 2012 to 2014 |
2 | Maintenance service for Phu My 2.2 thermal power plant | Mekong Energy | To supply mechanic, technician for turnaround maintenance of thermal power plant |
From 2013 to 2014 |
3 | Expansion of CLPP phase 2, Rang Dong oil field | JPVC Vietnam | To supply operation technician for onshore and offshore |
2012 |
4 | Construction of Dung Quat Refinery & Petrochemical Plant | Technip Consortium | To supply commissioning engineer, mechanic, technician for installation and commissioning of rotating equipment and electrical system |
From 2009 to 2010 |
5 | New shipbuilding (Series vessel PTAS) | Strategic Marine (V) Co., Ltd (SMV) | To supply welder, fitter for structure, pipe spool fabrication and installation |
From 2012 to 2014 |
6 | Dry-dock vessel Mermaid Challenger (AHTS type) |
Sai Gon Shipyard Co., Ltd TRIYARDS SSY (EMAS group) |
To provide carry out dismantling, installation, maintenance and repair: - Main engine and propeller shaft - Rudder and thrusters - Hydraulic pump, winch. - Electrical system and insulation - And miscellaneous items |
2013 to 2014 |
7 | Dry-dock vessel Lewek Emerald (AHTS type) | |||
8 | Floating repair vessel Silver Discoverer (Cruiser Ship) | |||
9 | Floating repair vessel Loyz Carrier (Tanker type) | |||
10 | Floating repair vessel Lewek Lynx (PSV type) | |||
11 | New shipbuilding aluminum vessel Hull No. H194, H195, H199, H200, H398 |
Strategic Marine (V) Co., Ltd (SMV) |
To supply welder, fitter, helper for aluminum structure fabrication and installation |
From 09/2014 to 12/2014 |
12 | Mong Duong 2 thermal power plant | Valence Corporation Ltd |
- To supply fitter & welder to fabricate and install pipe system - To carry out the circulation flushing pipe system after installation - To supply scaffolder and scaffolding materials to carry out the scaffolding installation & dismantling |
From 2013 to 2014 |
13 | New shipbuilding vessel No. SEAS 70, 71, 73, 74 |
South East Asia Shipyard (SEAS) |
To supply manpower including: welder, pipe fitter, helper for pipe fabrication and installation To carry out the pipe fabrication & onboard installation and leak test. |
2014 |
14 | Huc6X offshore platform | PTSC Offshore Services Co., Ltd (POS) |
To provide skilled and experienced mechanical technicians working on platform for maintenance | Mid 2013 to first 2014 |
15 | Songa offshore platform |
Vietnam Glocoating Engineering JSC (GCE) |
To provide skilled and experienced mechanical technicians working on platform for maintenance | Mid 2013 to first 2014 |
16 | Dry-dock vessel Westsea Titan |
Sai Gon Shipyard Co., Ltd TRIYARDS SSY (EMAS group) |
To carry out dismantling, installation, maintenance and repair: - Propeller shaft overhauling - Rudder and thrusters overhauling - Hydraulic pump, winch - And miscellaneous repair items |
From 05/2015 to 07/2015 |
17 | Afloating repair vessel Sea Commanche |
VINA Marine Offshore Services Ltd (VMOS) |
To provide manpower, material, necessary tools & equipment to repair cargo rail | From 05/2015 to 06/2015 |
18 | Anchorage repair vessel Sea Cheyenne |
VINA Marine Offshore Services Ltd (VMOS) |
To provide manpower, material, necessary tools & equipment to repair bulwark | 06/2015 to 07/2015 |
19 | Vincom Phu Quoc | TRUONG HAI ENGINEERING & TRADE COMPANY LTD | To provide fitters, welders and foreman for animal house fabrication and installation | 09/2015-10/2015 |
20 | Turnaround maintenance Phu My fertilizer | PETROVIETNAM Energy Technology Corporation (PV EIC) |
To supply maintenance/repair technician for pump and pipe system To provide 6G welder, E&I engineer and E&I technician |
2013 - 2015 |
21 | Manpower supply to Saigon TANTEC | Sai Gon TANTEC Leather Limited | To supply common workers, technician for operation & maintenance factory | 2013 - 2015 |
22 | New shipbuilding | South East Asia Shipyard (SEAS) | To supply fitter, welder 3G/6G/6GR to carry out repair and install the pipe lines. Installation, connection and commissioning | 02/2014 - 2015 |
23 | Piping fabrication for Nam Con Son 2 pipe line | PETROVIETNAM Steel Pipe Joint Stock Company (PV PIPE) | To supply operation worker, 6G/6GR welder, rigger, store keeper, machine operator, safety officer, QC inspector | 05/2014 - 2015 |
24 | SEAS 92, 93 | PRIOU VIETNAM | To carry out heater and cooling copper pipe system installation on aluminum vessels | 12/2015-01/2016 |
25 | Dredging seabed in front of habour of Nghi Son Refinery & Petrochemical Plant | Van Oord Dredging and Marine Contractors BV | To supply AB crew, mechanic, translator working onboard vessel for dredging seabed in front of habour of Nghi Son refinery | 2015 |
26 | O Mon thermal power plant | DAELIM INDUSTRIAL CO., LTD | To supply material controller, M&P engineer, E&I engineer | Mid 2014 - 2015 |
27 | Ca Mau thermal power plant | Petrovietnam Power Service (PVPS) | To supply skillful mechanic for turnaround maintenance of factory | 2015 |
II. ONGOING PROJECTS |
||||
1 | New ship building Offshore Service Vessel (PSV, OSV) | VARD Vung Tau Ltd | To supply mechanic, fitter, welder and scaffolder for construction vessels | 06/2014 till present |
2 | Manpower supply to Sai Gon TANTEC | Sai Gon TANTEC Leather Limited | To supply common workers, technician for operation & maintenance factory | 01/2016 till present |
3 | Equipment Installation for Nghi Son Refinery & Petrochemical Plant |
Cong Nghiep Viet Co., Ltd (VIECC) |
To supply helper, mechanic, mechanical team leader to carry out the equipment installation | 03/2015 till present |
4 | SMP9 Equipment Installation for Nghi Son Refinery & Petrochemical Plant | PTSC Quang Ngai Joint Stock Company | To carry out the installation of SMP9 equipment package for Nghi Son Refinery & Petrochemical Plant | 04/2015 till present |
5 | Nghi Son refinery & petrochemical plant | U-MAC VIETNAM Co., Ltd | To provide skilled riggers | 05/2015 till present |
6 | Offshore and onshore projects | PTSC Offshore Services Co., Ltd (POS) | To provide experienced and skill QC inspector, E&I engineer, structure & piping supervisor, HSE officer, painting inspector, mechanical technician, etc. | 02/2015 till present |
7 | Nghi Son refinery & petrochemical plant | PTSC Quang Ngai Joint Stock Company | To provide scaffolders | 09/2015 till present |
8 | Nghi Son refinery & petrochemical plant |
Petrolimex Construction JSC 1 (PCC1) |
To provide scaffolders, 3G welders, 6G welders, pipe fitters, helpers to install pipe line on pipe rack and tower | 12/2015 till present |
9 | Nghi Son refinery & petrochemical plant | Dong Xuyen Port | To provide electrician for cable pulling and cable tray installation | 01/2016 till present |
10 | Shipbuilding, industry project | Sai Gon Shipyard Co., Ltd TRIYARDS SSY | To provide structure fitter, outfitting worker, pipe fitter, foreman, welders | 09/2015 till present |
11 | Crew supplying for vessel laid up at port | BOURNBON OFFSHORE SUFT | To provide AB and oiler watching vessel laid up at Ben Luc port, Long An | 12/2015 till present |
12 | Maintain Offshore Myanma Rig – HUC BADAMYAR | PTSC Offshore Services Co., Ltd (POS) | To provide structure welders and Stainless steel duplex piping welders | 2/2016 till present |
13 | Recovery after fire of Perstima Vietnam Ltd |
Belfor (Asia) Pte Ltd |
To provide general workers for cleaning Perstima factory in VSIP IZ- Binh Duong | 5/2016 till present |